Adobe Web Photo Gallery
3/20/2009
vshelor@carolinefurnace.org
page 3 of 10
BH 035 digging a hole for the reservoir.jpg
BH 036 installing plumbing and duct work.jpg
BH 037 plumbing work continues.jpg
BH 038 loading shale from the reservoir hole.jpg
BH 039 dumpring rock to improve the road.jpg
BH 040 siding.jpg
BH 041 siding.jpg
BH 042 siding.jpg
BH 043 exterior.jpg
BH 044 wallboard goes up inside bathhouse.jpg
BH 045 eight showers taking shape on the boys side.jpg
BH 046 side for toilets and urinals.jpg
BH 047 side for sinks.jpg
BH 048 the door is by the sinks.jpg
BH 049 the entrance has a closet.jpg